National Center for Nuclear Research, Swierk - Poland

From Nuclear Heritage
Revision as of 20:54, 23 March 2012 by Dominik (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Maria

  • construction started in June 1970 and was complted in December 1974[1]
  • water and beryllium moderated, ligth water cooled pool reactor[2]
  • nominal power: 30 MW[2]
  • uesed to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999
  • For minimizing the danger of profileration plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU).
  • In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide.
  • In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prossesed at the majak plant.