Difference between revisions of "National Center for Nuclear Research, Swierk - Poland"

From Nuclear Heritage
Jump to navigationJump to search
 
Line 1: Line 1:
 
Maria
 
Maria
  
*construction started in June 1970 and was complted in December 1974<ref>http://www-pub.iaea.org/MTCD/publications/PDF/P1360_ICRR_2007_CD/Papers/G.%20Krzysztoszek.pdf 23.03.2012</ref>
+
*construction started in June 1970 and was completed in December 1974<ref>http://www-pub.iaea.org/MTCD/publications/PDF/P1360_ICRR_2007_CD/Papers/G.%20Krzysztoszek.pdf 23.03.2012</ref>
 
*water and beryllium moderated, ligth water cooled pool reactor<ref name="IAEA">IAEA: http://nucleus.iaea.org/RRDB/Reports/Container.aspx?Id=R1</ref>
 
*water and beryllium moderated, ligth water cooled pool reactor<ref name="IAEA">IAEA: http://nucleus.iaea.org/RRDB/Reports/Container.aspx?Id=R1</ref>
 
*nominal power: 30 MW<ref name="IAEA"/>
 
*nominal power: 30 MW<ref name="IAEA"/>
*uesed to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999   
+
*used to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999   
*For minimizing the danger of profileration plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU).
+
*For minimizing the danger of proliferation plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU).
 
*In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide.
 
*In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide.
*In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prossesed at the majak plant.
+
*In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prosessed at the majak plant.
 +
*

Revision as of 21:01, 23 March 2012

Maria

  • construction started in June 1970 and was completed in December 1974[1]
  • water and beryllium moderated, ligth water cooled pool reactor[2]
  • nominal power: 30 MW[2]
  • used to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999
  • For minimizing the danger of proliferation plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU).
  • In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide.
  • In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prosessed at the majak plant.