Maria | Maria | ||
− | *construction started in June 1970 and was | + | *construction started in June 1970 and was completed in December 1974<ref>http://www-pub.iaea.org/MTCD/publications/PDF/P1360_ICRR_2007_CD/Papers/G.%20Krzysztoszek.pdf 23.03.2012</ref> |
*water and beryllium moderated, ligth water cooled pool reactor<ref name="IAEA">IAEA: http://nucleus.iaea.org/RRDB/Reports/Container.aspx?Id=R1</ref> | *water and beryllium moderated, ligth water cooled pool reactor<ref name="IAEA">IAEA: http://nucleus.iaea.org/RRDB/Reports/Container.aspx?Id=R1</ref> | ||
*nominal power: 30 MW<ref name="IAEA"/> | *nominal power: 30 MW<ref name="IAEA"/> | ||
− | * | + | *used to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999 |
− | *For minimizing the danger of | + | *For minimizing the danger of proliferation plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU). |
*In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide. | *In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide. | ||
− | *In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee | + | *In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prosessed at the majak plant. |
+ | * |
Revision as of 21:01, 23 March 2012
Maria
- construction started in June 1970 and was completed in December 1974[1]
- water and beryllium moderated, ligth water cooled pool reactor[2]
- nominal power: 30 MW[2]
- used to use highly enriched Uranium of 80% U235 but has been converted tu usage of 36%HEU in 1999
- For minimizing the danger of proliferation plans had been made to converte the reactor further to use Ligthly Enriched Uranium (LEU).
- In 2005 aproximatly 39 kg of highly HEU were transferd tu russia. This occured among the "Global treat reduction initatve", a treatment between russia and the unitet states wich subsequently supports the removal or disposal of excess HEU and other and radiological materials from civilian sites worldwide.
- In september 2009 Poland and russia signed a contarct to export spent nuclear fuel to russia to bee prosessed at the majak plant.