** Barsebäck 1: commissioned 1969, startup January 1975, connected to grid May 15 1975, shut down November 30 1999<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1502 - February 21, 2011</ref>
 
** Barsebäck 1: commissioned 1969, startup January 1975, connected to grid May 15 1975, shut down November 30 1999<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1502 - February 21, 2011</ref>
 
** Barsebäck 2: commissioned 1970, startup 1977(?), connected to grid March 21 1977, shut down May 31 2005<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1502 - February 21, 2011</ref>
 
** Barsebäck 2: commissioned 1970, startup 1977(?), connected to grid March 21 1977, shut down May 31 2005<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1502 - February 21, 2011</ref>
** The reactors are awaiting deconstruction, which will be started when the expansion of is ready, which is estimated to be in 2020.<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1507 - February 21, 2011</ref> <ref>http://www.skb.se/Templates/Standard____22584.aspx - February 21, 2011</ref>
+
** The reactors are awaiting deconstruction, which will be started when the expansion of the [[SFR Repository]] at Forsmark is ready, which is estimated to be in 2020.<ref>http://www.barsebackkraft.se/templates/Umain.asp?ItemID=1507 - February 21, 2011</ref> <ref>http://www.skb.se/Templates/Standard____22584.aspx - February 21, 2011</ref>
 
* How much a power plant produces
 
* How much a power plant produces
 
* '''type of reactor:''' BWR
 
* '''type of reactor:''' BWR

Revision as of 22:49, 21 February 2011

Draft

Source for pictures

http://commons.wikimedia.org/wiki/Category:Barseb%C3%A4ck_nuclear_power_plant

Data

Location:

  • Operator: Barsebäck Kraft AB (Owned by Ringhals AB, which in turn is owned by Vattenfall (70,44 %) and E.ON Kärnkraft Sverige AB (29,56 %). The physical facility is owned 100% by E.ON Kärnkraft AB[1]
  • Capacity: Barsebäck 1 & 2: 600 MW netto. Total: 1200 MW netto.
  • (How much radiation it sets free?)
  • Dates of construction & operation: Sydkraft decided on buying land in Barsebäck for a NPP on December 10 1965.[2]
    • Barsebäck 1: commissioned 1969, startup January 1975, connected to grid May 15 1975, shut down November 30 1999[3]
    • Barsebäck 2: commissioned 1970, startup 1977(?), connected to grid March 21 1977, shut down May 31 2005[4]
    • The reactors are awaiting deconstruction, which will be started when the expansion of the SFR Repository at Forsmark is ready, which is estimated to be in 2020.[5] [6]
  • How much a power plant produces
  • type of reactor: BWR
  • about exploration sites: Sizes
  • how much waste a reactor produces per year
  • information about the fuel
  • Employees: ca 100[7]
  • number of people living around the facility:
  • number of accidents:

Summary

short text (1'500 characters max.)

Resistance

contact details of critical groups working against this facility

  • group name, phone, email, website, postal address

Links

links to operator and critical websites

Operator: http://www.barsebackkraft.se/

References