Olkiluoto VLJ Repository

From Nuclear Heritage
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

provided by an exhibition presented at the international anti-nuclear conference in Vienna on May 31, 2013

  • situated at the Olkiluoto site; construction started in 1988; final disposal started in 1992, with the first transfer of waste from the Olkiluoto NPP on May 8, 1992[1]
  • 20.8.1998: The Council of State granted a new operation licence for (...) the low and medium-level waste interim storages[1]
  • final repository for so-called "operating waste" (VLJ) - LMAW
  • waste drums in concrete boxes

The silos are at the depth of 60-100 meters.

Multiple barriers:

  • solidified waste
  • concrete box
  • concrete silo
  • filling material
  • shotcreted wall
  • bedrock

Consists of:

  • shaft - height 60 m
  • transport tunnel
  • crane hall:
    • length 65.0 m
    • width 23.4 m
    • height 10.8 m
    • volume 14,900 m³
  • intermediate level waste silo:
    • diameter 23.6 m
    • height 34.5 m
    • inside dimensions of the reinforced concrete silo:
      • diameter 19.9 m
      • height 32.3 m
      • volume 15,100 m³
  • low level waste silo:
    • diameter 23.6 m
    • height 33.6 m
    • volume 14,700 m³


  1. 1.0 1.1 TVO: Pocket Guide 2010; Eura Print Oy, 2010 - "8.5.1992: The first waste transfer to the low and medium-level nuclear waste repository (VLJ) was made."